An accurate lashing quote needs at least: dimensions and gross weight, centre of gravity, lifting and lashing points, transport unit type, loading location and date. Photos or drawings speed up the assessment.
Checklist
| Information | Why it matters |
|---|---|
| Dimensions (L×W×H) | Transport unit choice and out-of-gauge check |
| Gross weight | Equipment ratings and load distribution |
| Centre of gravity | Placement and lashing layout |
| Lifting/lashing points | Permitted attachment points |
| Transport unit | 20'/40', HC, flat rack, open top, breakbulk |
| Location and date | Crew and equipment planning |
| Sensitive surfaces | Edge protection and contact points |
| Photos / drawings | Speed and accuracy of the pre-assessment |
If some details are unknown
Centre of gravity or lashing-point data is not always to hand. We then ask the manufacturer; if it cannot be obtained, we propose a conservative arrangement and state the assumptions clearly in the quote.
How our quote process works
When you submit the form, your request is logged with a reference number. If information is missing after the pre-assessment we contact you, then prepare a quote covering scope, materials and assumptions.
Frequently asked questions
Do you have a price list?
No. Every job is planned around the cargo, so pricing is prepared per request.


